Massimiliano Maria Schiraldi

Qualifica
ASSOCIATO CONFERMATO
Fonte dei dati: Archivio della Ricerca http://art.torvergata.it
  1. Di Luozzo, S., Del Beato, F., & Schiraldi, M.M. (2021). Measuring coherence of performance measurement indicators in complex and changing environments. THE INTERNATIONAL JOURNAL OF PRODUCTIVITY AND PERFORMANCE MANAGEMENT, ahead-of-print(ahead-of-print) [10.1108/IJPPM-03-2021-0176]. Dettagli
  2. Bait, S., Marino Lauria, S., & Schiraldi, M.M. (2020). Supporting industrial investments in underdeveloped countries through a competency model for manufacturing workforce. Paper presented at XXV Summer School “Francesco Turco” – Industrial Systems Engineering. Dettagli
  3. Ciancarelli, F., D'orazio, L., & Schiraldi, M.M. (2020). Supply chain management competencies: Proposal of a competency framework for job posting analysis. In Proceedings of the Summer School Francesco Turco. AIDI - Italian Association of Industrial Operations Professors. Dettagli
  4. Di Luozzo, S., Vincenzi, M., & Schiraldi, M.M. (2020). Estimating the distribution cost in large-scale retail trade companies from network configuration. In Proceedings of the Summer School Francesco Turco. AIDI - Italian Association of Industrial Operations Professors. Dettagli
  5. Ferraro, E., Vincenzi, M., & Schiraldi, M.M. (2020). Supply chain management in LSRT industry: Differences between theory and practice. In Proceedings of the Summer School Francesco Turco. AIDI - Italian Association of Industrial Operations Professors. Dettagli
  6. Marino Lauria, S., Bait, S., & Schiraldi, M.M. (2020). Framing manufacturing processes resource requirements in underdeveloped countries: A study on industrial investments in Africa. In Proceedings of the Summer School Francesco Turco. AIDI - Italian Association of Industrial Operations Professors. Dettagli
  7. D'Orazio, L., Messina, R., & Schiraldi, M.M. (2020). Industry 4.0 and world class manufacturing integration: 100 technologies for a WCM-I4.0 matrix. APPLIED SCIENCES, 10(14), 4942 [10.3390/app10144942]. Dettagli
  8. Schiraldi, M.M., & Varisco, M. (2020). Overall Equipment Effectiveness: consistency of ISO standard with literature. COMPUTERS & INDUSTRIAL ENGINEERING, 145, 106518 [10.1016/j.cie.2020.106518]. Dettagli
  9. Di Luozzo, S., Varisco, M., & Schiraldi, M.M. (2020). The diffusion of international standards on managerial practices. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 12, 1-17 [10.1177/1847979020921611]. Dettagli
  10. Bait, S., Di Pietro, A., & Schiraldi, M.M. (2020). Waste reduction in production processes through simulation and VSM. SUSTAINABILITY, 12(8), 3291 [10.3390/SU12083291]. Dettagli
  11. Cinelli, M., Ferraro, G., Iovanella, A., Lucci, G., & Schiraldi, M.M. (2020). A network perspective for the analysis of bill of materials. Paper presented at 13th CIRP Conference on Intelligent Computation in Manufacturing Engineering, CIRP ICME 2019, Naples [10.1016/j.procir.2020.05.004]. Dettagli
  12. Bait, S., Di Pietro, A., & Schiraldi, M.M. (2019). Extended-VSM: a top-down approach for building simulation models through VSM. Paper presented at 9th International Conference on Production Engineering and Management, Trieste. Dettagli
  13. D'Orazio, L., Schiraldi, M.M., & Vincenzi, M. (2019). Competences in operations management: a literature review. Paper presented at Industrial Systems Engineering: “Augmented knowledge: a new era of industrial systems engineering”, Brescia. Dettagli
  14. Di Pietro, A., D'Orazio, L., Vincenzi, M., & SCHIRALDI, M.M. (2019). Distribution network design in Large-Scale Retail Trade industry with K-means approach. In Large Scale Retail Trade; Facility location problem; K-means algorithm. Dettagli
  15. Comi, A., Schiraldi, M.m., & Buttarazzi, B. (2018). Smart urban freight transport: tools for planning and optimising delivery operations. SIMULATION MODELLING PRACTICE AND THEORY, 88, 48-61 [10.1016/j.simpat.2018.08.006]. Dettagli
  16. D’Orazio, L., Schiraldi, M.m., & Varisco, M. (2018). KPIs in operations management: Extending the ISO22400 standard scope. In Proceedings of the Summer School Francesco Turco (pp.457-465). AIDI - Italian Association of Industrial Operations Professors. Dettagli
  17. Lucci, G., Schiraldi, M.m., & Vincenzi, M. (2018). Choosing the minimum order size in large-scale retail trade distribution. In Proceedings of the Summer School Francesco Turco (pp.284-290). AIDI - Italian Association of Industrial Operations Professors. Dettagli
  18. Varisco, M., Johnsson, C., & Schiraldi, M.m. (2018). Proposal for a classification of ISO22400 KPIs for manufacturing operations management. In Proceedings of the Summer School Francesco Turco (pp.444-449). AIDI - Italian Association of Industrial Operations Professors. Dettagli
  19. Zhu, L., Meivik, J., Johnsson, C., Bengtsson, K., Pettersson, H., Varisco, M., et al. (2018). Key Performance Indicators in Manufacturing Operations Management: A Case Study of the IS022400-Standard Applied at Volvo Cars. In IEEE International Conference on Emerging Technologies and Factory Automation, ETFA (pp.1149-1152). Institute of Electrical and Electronics Engineers Inc.. Dettagli
  20. Varisco, M., Deuse, J., Johnsson, C., Nöhring, F., Schiraldi, M.M., & Wöstmann, R. (2018). From production planning flows to manufacturing operation management KPIs: linking ISO18828 & ISO22400 standards. In 16th IFAC Symposium on Information Control Problems in Manufacturing INCOM 2018 (pp.25-30). Elsevier B.V.. Dettagli
  21. Varisco, M., Johnsson, C., Mejvik, J., Schiraldi, M.M., & Zhu, L. (2018). KPIs for Manufacturing Operations Management: driving the ISO22400 standard towards practical applicability. In IFAC PapersOnLine (pp.7-12). Elsevier B.V.. Dettagli
  22. Comi, A., Buttarazzi, B., Schiraldi, M., Innarella, R., Varisco, M., & Traini, P. (2018). An advanced planner for urban freight delivering. ARCHIVES OF TRANSPORT, 4(48), 27-40 [10.5604/01.3001.0012.8363]. Dettagli
  23. Zhu, L., Johnsson, C., Varisco, M., & Schiraldi, M. (2018). Key performance indicators for manufacturing operations management – gap analysis between process industrial needs and ISO 22400 standard. PROCEDIA MANUFACTURING, 25, 82-88 [10.1016/j.promfg.2018.06.060]. Dettagli
  24. Zhu, L., Johnsson, C., Mejvik, J., Varisco, M., & Schiraldi, M. (2017). Key performance indicators for manufacturing operations management in the process industry. In IEEE International Conference on Industrial Engineering and Engineering Management (pp.969-973). IEEE Computer Society. Dettagli
  25. Gemma, A., Schiraldi, M.m., & Varisco, M. (2017). Estimating project complexity for enabling omnichannel strategy. Paper presented at 6th International Workshop on Luxury Retail, Operations and Supply Chain Management, Milano. Dettagli
  26. Giordano, F., Lucci, G., Schiraldi, M.m., & Varisco, M. (2017). Quantifying the impact of ERP malfunctioning in a manufacturing plant. Paper presented at Conference on "Industrial Systems Engineering", Palermo. Dettagli
  27. Giordano, F., Lucci, G., Schiraldi, M.m., & Varisco, M. (2017). Risk Assessment framework for delivery process: A delivery features perspective to optimize efforts in the assessment phase. Paper presented at Conference on "Industrial Systems Engineering", Palermo. Dettagli
  28. Cinelli, M., Ferraro, G., Iovanella, A., Lucci, G., & Schiraldi, M.m. (2017). A Network Perspective on the Visualization and Analysis of Bill of Materials. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT [10.1177/1847979017732638]. Dettagli
  29. Comi, A., Buttarazzi, B., Schiraldi, M.M., Innarella, R., Varisco, M., & Rosati, L. (2017). DynaLOAD: a simulation framework for planning, managing and controlling urban delivery bays. TRANSPORTATION RESEARCH PROCEDIA, 22, 335-344 [10.1016/j.trpro.2017.03.049]. Dettagli
  30. Lucci, G., Schiraldi, M.m., & Varisco, M. (2016). Fashion luxury retail supply chain: Determining target stock levels and lost sale probability. In Proceedings of the Summer School Francesco Turco (pp.192-197). AIDI - Italian Association of Industrial Operations Professors. Dettagli
  31. Baciarello, L., & Schiraldi, M.m. (2015). A Proposal for a Management-oriented Process Capability Index. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 7(26), 1-13 [10.5772/62185]. Dettagli
  32. Lucci, G., Ferretti, M., Giordano, F., & Schiraldi, M.m. (2015). Design a performance measurement system: Metrics to identify the most critical indicators according to operative policies. In Proceedings of the Summer School Francesco Turco (pp.249-255). AIDI - Italian Association of Industrial Operations Professors. Dettagli
  33. Chengzhi, C., De Carlo, F., Schiraldi, M.M., Vellini, M., & Zhu, S. (2015). Sustainability opportunities through small-scale rice-husk power generators in China. In Workshop on sustainability in business and economics. Dettagli
  34. D'Avino, M., De Simone, V., Iannucci, M., & Schiraldi, M.M. (2015). Guidelines for e-Startup Promotion Strategy. JOURNAL OF TECHNOLOGY MANAGEMENT & INNOVATION, 10(1), 1-16 [10.4067/S0718-27242015000100001]. Dettagli
  35. Angeletti, C., Giacchero, A., & Schiraldi, M. (2015). Managing rare and undetectable events in risk assessment: the case of a satellite system launch project. INTERNATIONAL JOURNAL OF PROJECT ORGANISATION AND MANAGEMENT, 6(1/2), 107-120 [10.1504/IJPOM.2014.059747]. Dettagli
  36. Cao, W., Cai, C., & Schiraldi, M.m. (2014). Analyses on rapeseed yield in China based on the prediction of yield potential. INTERNATIONAL JOURNAL OF AGRICULTURAL AND STATISTICS SCIENCES, 10(2), 285-290. Dettagli
  37. Schiraldi, M.M. (2014). Innovations in the pharmaceutical industry. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 6(15), 1-2 [10.5772/59593]. Dettagli
  38. De Minicis, M., Giordano, F., Poli, F., & Schiraldi, M.m. (2014). Recipe Development Process Re-Design with ANSI/ISA-88 Batch Control Standard in Pharmaceutical Industry. Accepted. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 6(1), 1-12 [10.5772/59025]. Dettagli
  39. De Simone, V., Giordano, F., & Schiraldi, M.M. (2014). Intelligent Health Management System: an Italian project to streamline stock management in health facilities. In Proceedings of the Summer School Francesco Turco (pp.185-190). AIDI. Dettagli
  40. Piermattei, L., Poli, F., Schiraldi, M., Spataro, C., & Uffreduzzi, S. (2014). Proposal of a framework for a sustainability maturity model. In Proceedings of the Summer School Francesco Turco (pp.367-372). AIDI - Italian Association of Industrial Operations Professors. Dettagli
  41. D'Avino, M., De Simone, V., & Schiraldi, M.m. (2014). Revised MRP for reducing inventory level and smoothing order releases: a case in manufacturing industry. PRODUCTION PLANNING & CONTROL, 25(10), 814-820 [10.1080/09537287.2013.764579]. Dettagli
  42. Fera, M., Iannone, R., Macchiaroli, R., Miranda, S., & Schiraldi, M.M. (2014). Project appraisal for small and medium size wind energy installation: the Italian wind energy policy effects. ENERGY POLICY, 74, 621-631 [10.1016/j.enpol.2014.07.012]. Dettagli
  43. Cai, C., Liu, J., Zhang, W., & Schiraldi, M. (2014). Un-sustainability of global ecosystem based on the carrying capacity of agro-ecosystem. RESEARCH ON CROPS, 15(1), 281-285 [10.5958/j.2348-7542.15.1.041]. Dettagli
  44. Battista, C., Fumi, A., Laura, L., & Schiraldi, M.m. (2014). Multiproduct slot allocation heuristic to minimize storage space. INTERNATIONAL JOURNAL OF RETAIL & DISTRIBUTION MANAGEMENT, 42(3), 172-186 [10.1108/IJRDM-03-2012-0024]. Dettagli
  45. De Carlo, F., & Schiraldi, M. (2013). Sustainable choice of the location of a biomass plant: an application in Tuscany. INTERNATIONAL JOURNAL OF ENGINEERING AND TECHNOLOGY, 5(5), 4261-4272. Dettagli
  46. Dello Stritto, G., & Schiraldi, M. (2013). A Strategy Oriented Framework for Food & Beverage e-Supply Chain Management. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(50), 1-12 [10.5772/57167]. Dettagli
  47. Nenni, M., & Schiraldi, M. (2013). Validating Virtual Safety Stock Effectiveness through Simulation. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(41), 1-8 [10.5772/56859]. Dettagli
  48. Busato, D., Fera, M., Iannone, R., Mancini, V., & Schiraldi, M. (2013). Evaluating RFID opportunity through process analysis. INTERNATIONAL JOURNAL OF RF TECHNOLOGIES: RESEARCH AND APPLICATIONS, 5(1), 81-105 [10.3233/RFT-130047]. Dettagli
  49. Greco, M., Grimaldi, M., Scarabotti, L., & Schiraldi, M. (2013). The source of competitive advantage in University spin-offs: a case study. JOURNAL OF TECHNOLOGY MANAGEMENT & INNOVATION, 8(3), 139-151. Dettagli
  50. Battistoni, E., Bonacelli, A., Fronzetti Colladon, A., & Schiraldi, M. (2013). An analysis of the effect of operations management practices on performance. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(44), 1-11 [10.5772/56919]. Dettagli
  51. Fronzetti Colladon, A., Naldi, M., & Schiraldi, M. (2013). Quality management in the design of TLC call centers. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(48), 1-9 [10.5772/56921]. Dettagli
  52. Battistoni, E., Fronzetti Colladon, A., Scarabotti, L., & Schiraldi, M. (2013). Analytic hierarchy process for new product development. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(42), 1-8 [10.5772/56816]. Dettagli
  53. D'Avino, M., Macry Correale, M., & Schiraldi, M.m. (2013). No news, good news: effect of delayed information sharing in supply chain management. INTERNATIONAL JOURNAL OF MANAGEMENT AND DECISION MAKING, 12(3), 312-334. Dettagli
  54. Fera, M., Iannone, R., Mancini, V., Schiraldi, M., & Scotti, P. (2013). Economical evaluation of RFID technology in production environment,. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(39), 1-13 [10.5772/56750]. Dettagli
  55. Battista, C., & Schiraldi, M. (2013). The Logistic Maturity Model: Application to a Fashion Company. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(29), 1-11 [10.5772/56838]. Dettagli
  56. Fumi, A., Pepe, A., Scarabotti, L., & Schiraldi, M. (2013). Fourier Analysis for Demand Forecasting in a Fashion Company. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(30), 1-10 [10.5772/56839]. Dettagli
  57. Giacchero, A., Giordano, F., & Schiraldi, M. (2013). From business continuity to design of critical infrastructures: ensuring the proper resilience level to datacentres. INTERNATIONAL JOURNAL OF ENGINEERING & TECHNOLOGY, 5(4), 3544-3553. Dettagli
  58. Fumi, A., Scarabotti, L., & Schiraldi, M. (2013). Minimizing warehouse space with dedicated storage policy. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(21), 1-8 [10.5772/56756]. Dettagli
  59. Fumi, A., Scarabotti, L., & Schiraldi, M. (2013). The effect of slot-code optimization in warehouse order picking. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(20), 1-10 [10.5772/56803]. Dettagli
  60. Nenni, M., & Schiraldi, M. (2013). Optimizing spare parts inventory in shipping industry. INTERNATIONAL JOURNAL OF ENGINEERING & TECHNOLOGY, 5(3), 3152-3157. Dettagli
  61. Fumi, A., Scarabotti, L., & Schiraldi, M.m. (2013). The Effect of Slot-Code Optimization on Travel Times in Common Unit-Load Warehouses. INTERNATIONAL JOURNAL OF SERVICES AND OPERATIONS MANAGEMENT, 15(4), 507-527. Dettagli
  62. Bregni, A., D'Avino, M., De Simone, V., & Schiraldi, M. (2013). Formulas of Revised MRP. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(10), 1-8. Dettagli
  63. Giordano, F., & Schiraldi, M. (2013). On Just-In-Time Production Leveling. In M. Schiraldi (a cura di), Operations Management (pp. 141-162). INTECH. Dettagli
  64. Schiraldi, M. (a cura di). (2013). Operations Management. INTECH. Dettagli
  65. Baciarello, L., D'Avino, M., Onori, R., & Schiraldi, M. (2013). Lot Sizing Heuristics Performance. INTERNATIONAL JOURNAL OF ENGINEERING BUSINESS MANAGEMENT, 5(6), 1-10 [10.5772/56004]. Dettagli
  66. Battista, C., Bianchi, P., Schiraldi, M., Li, H., Zhou, W., & Cai, C. (2013). Inventory Control Policies for Agricoltural Product Supply Chain based on the Project of EEA. GUIZHOU NONGYE KEXUE, 1, 208-212. Dettagli
  67. Cai, C., Zhang, W., Liang, Y., Battista, C., Schiraldi, M., & Fumi, A. (2013). Analysis on Rice Yield in China on the basis of the Prediction of Potential Yield in China. RESEARCH ON CROPS, 14(1), 1-6. Dettagli
  68. D'Avino, M., Bregni, A., & Schiraldi, M. (2013). A Revised and improved version of the MRP algorithm: Rev MRP. In Y. Wang (a cura di), Mechanical science and engineering 3. (pp. 276-280). Scientific.net [10.4028/www.scientific.net/AMM.328.276]. Dettagli
  69. Dello Stritto, G., Falsini, D., & Schiraldi, M.M. (2013). Supply chain network design for the diffusion of a new product. INTERNATIONAL JOURNAL OF ENGINEERING SCIENCE AND TECHNOLOGY, 5(2), 79-92. Dettagli
  70. Fumi, A., & Schiraldi, M. (2012). La domanda di logistica in ambito urbano [Altro]. Dettagli
  71. Mancini, V., Pasquali, M., & Schiraldi, M.m. (2012). Opportunities for using RFID in the aircraft production process. INTERNATIONAL JOURNAL OF RF TECHNOLOGIES: RESEARCH AND APPLICATIONS, 3(4), 243-255 [10.3233/RFT-2012-027]. Dettagli
  72. Dello Stritto, G., Falsini, D., Schiraldi, M., & Secomandi, N. (2012). A stochastic dynamic programming approach for integrating supply chain network design and new product diffusion. In Proceedings of the 4th P&OM World Conference. Amsterdam : POMS. Dettagli
  73. Falsini, D., Fondi, F., & Schiraldi, M. (2012). A logistics provider evaluation and selection methodology based on AHP, DEA and Linear Programming integration. INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH. Dettagli
  74. Battista, C., Fumi, A., Scarabotti, L., & Schiraldi, M. (2012). The Logistic Maturity Model: guidelines for logistic processes continuous improvement. In Proceedings of the POMS 23rd Annual Conference. Chicago : POMS. Dettagli
  75. Fumi, A., Scarabotti, L., & Schiraldi, M. (2012). Criteria for a warehouse tool with optimal storage/retrieval and product-allocation procedures. In Proceedings of the POMS 23rd Annual Conference. Chicago : POMS. Dettagli
  76. Battista, C., Dello Stritto, G., Giordano, F., Iannone, R., & Schiraldi, M.M. (2011). Manufacturing Systems Modelling and Simulation Software Design: a Reference Model. In Annals of DAAAM for 2011 & Proceedings of the 22nd International DAAAM Symposium (pp.1107-1109). Vienna : B. Katalinic. Dettagli
  77. Bregni A, D'Avino M, & Schiraldi MM (2011). A New Approach to Lower MRP Nervousness. In Annals of DAAAM for 2011 & Proceedings of the 22nd International DAAAM Symposium (pp.1513-1515). Vienna : B. Katalinic. Dettagli
  78. Schiraldi, M. (2011). La gestione del cambiamento. In A. La Bella, & G. Capece (a cura di), Manuale di Direzione d'Impresa (pp. 395-441). Franco Angeli. Dettagli
  79. Battista, C., Dello Stritto, G., Giordano, F., Iannone, R., & Schiraldi, M.m. (2011). A business process modeling approach to support production systems analysis and simulation. In Proceedings of the 23 European Modeling & Simulation Symposium (EMSS 2011) (pp.325-332). GENOA : DIPTEM UNIVERSITA' DI GENOA. Dettagli
  80. Battista, C., DELLO STRITTO, G., Giordano, F., Iannone, R., & Schiraldi, M.m. (2011). A business process modeling approach to support production systems analysis and simulation. In Proceedings of the XXIII European Modeling & Simulation Symposium (pp.325-332). Rende (CS) : DIPTEM Università di Genova. Dettagli
  81. Battista, C., Dello Stritto, G., Iannone, R., & Schiraldi M.M. (2011). Integrating MRP in production systems simulation tools. In Proceeding of the Conference "breaking down the barriers between research and industry".. Padova. Dettagli
  82. Battista, C., Falsini, D., Scarabotti, L., & Schiraldi, M.M. (2011). Quantifying shelf-out-of-stock in fashion & apparel retail stores. In Proceeding of the Conference "breaking down the barriers between research and industry". Padova. Dettagli
  83. Battista, C., Fumi, A., Giordano, F., & Schiraldi, M.M. (2011). Storage Location Assignment Problem: implementation in a warehouse design optimization tool. In Proceeding of the Conference "breaking down the barriers between research and industry". Padova. Dettagli
  84. Buccini, A., Falsini, D., Giordano, F., & Schiraldi, M. (2011). Simplifying the Virtual Safety Stock formula. In Proceedings of the Conference "breaking down the barriers between research and industry". Padova. Dettagli
  85. Bordi, S., Buccini, A., & Schiraldi, M.M. (2011). A conceptual framework to develop assessment models for PLM projects. In Proceedings of the International Conference on Product Lifecycle Management. Eindhoven. Dettagli
  86. Buccini, A., Segel, E., & Schiraldi, M.M. (2011). Inventory Management in Closed Loop Supply Chains: a heuristic approach with safety stock on demand. In Proceeding of the XVIII EUROMA Conference. Cambridge : Cambridge University Press. Dettagli
  87. Armenia, S., Schiraldi, M.M., Falsini, D., & Canini, D. (2011). Improving management and tools for project performance in software development: a system dynamics approach.. In Proceedings of the XI EURAM Conference. Dettagli
  88. Falsini, D., Fondi, F., & Schiraldi, M.M. (2011). A logistics provider evaluation and selection methodology based on AHP and linear programming integration.. In Proceedings of the International Symposium on Analytic Hierarchy Process.. Dettagli
  89. Battista, C., Giordano, F., Iannone, R., & Schiraldi, M.M. (2010). A proposal for a standard framework for simulating and modeling manufacturing systems. In Proceedings of the Conference on sustainable development: industrial practice, education & research. Bari (Italy) : DIMEG Università di Bari. Dettagli
  90. Buccini, A., Giordano, F., & Schiraldi, M.M. (2010). Quality issues impacting production planning. In Proceedings of the Conference on sustainable development: industrial practice, education & research. Bari (Italy) : DIMEG Università di Bari. Dettagli
  91. Falsini, D., Fumarola, A., & Schiraldi, M.M. (2010). Depannage and other maintenance strategies for transportation fleets. In Proceedings of the Conference on sustainable development: industrial practice, education & research. Bari (Italy) : DIMEG Università di Bari. Dettagli
  92. Falsini, D., Perugia, A., & Schiraldi, M.M. (2010). An Operations management approach for radiology services. In Proceedings of the conference on sustainable development: industrial practice, education & research. Bari : DIMEG Università di Bari. Dettagli
  93. Tattoni, S., D'Avino, M., Fumarola, A., & Schiraldi, M.M. (2010). A multi-approach model to optimize municipal solid waste management: an application to an Italian metropolitan area. In Proceedings of the Conference on sustainable development: industrial practice, education & research. Bari (Italy) : DIMEG Università di Bari. Dettagli
  94. Battista, C., Bianchi, P., & Schiraldi, M.M. (2009). Inventory control policies for humanitarian logistics supply chain. In Proceedings of the Conference on sustainable development: the role of industrial engineering (pp.24-30). Bari (Italy) : DIMEG Università di Bari. Dettagli
  95. Falsini, D., Fumarola, A., & Schiraldi, M.M. (2009). Sustainable trasportation systems: dynamic routing optimization for a last-mile distribution fleet. In Proceeding of the Conference on sustainable development: the role of industrial engineering (pp.40-47). Bari (Italy) : DIMEG Università di Bari. Dettagli
  96. Giordano, F., Puleggi, A., & Schiraldi, M.M. (2009). Design of critical infrastructures: application to electrical systems. In Proceedings of the Conference on sustainable development: the role of industrial engineering (pp.5-13). Bari (Italy) : DIMEG Università di Bari. Dettagli
  97. Tattoni, S., Giannico, D., & Schiraldi, M.M. (2009). Operations management techniques for resource optimization in health care structures. In Proceedings of the Conference on sustainable development: the role of industrial engineering (pp.13-18). Bari (Italy). Dettagli
  98. Tattoni, S., & Schiraldi, M.M. (2009). Tecnica della scorta di sicurezza virtuale: applicazione al caso dei grandi elettrodomestici nella grande distribuzione organizzata. IMPIANTISTICA ITALIANA, 22(3), 59-63. Dettagli
  99. Armenia, S., Falsini, D., & Schiraldi, M.M. (2008). Improving management effectiveness and overall performance of software development projects through a system dynamics approach. In Proceedings of the 22. IPMA world congress. Dettagli
  100. Fusco Girard, F., & Schiraldi, M.M. (2008). A model for R&D project management: how does the number of teams influence the project performance?. In The Proceeding of the 22. IPMA World Congress. Dettagli
  101. Tattoni, S., Laura, L., & Schiraldi, M.M. (2008). Estimating projects duration in uncertain environments: Monte Carlo simulations strike back. In Proceedings of the 22. IPMA world congress. Dettagli
  102. De Masi, M., Pallini, M., Schiraldi, M.M., & Zeppieri, S. (2007). Ridurre le scorte con l’aiuto del sistema informativo. LOGISTICA MANAGEMENT(182), 33-39. Dettagli
  103. Schiraldi, M.M. (2007). La gestione delle scorte: fondamenti e principi applicativi. Napoli : Sistemi Editoriali. Dettagli
  104. Giordano, F., De Masi, M., & Schiraldi, M.M. (2006). Valutare l’investimento in sistemi ERP. LOGISTICA MANAGEMENT(169), 95-108. Dettagli
  105. Nenni, M.E., Rossi, A., & Schiraldi, M.M. (2005). Utilizzo di tecniche di simulazione per l’analisi delle prestazioni di risorse di produzione utilizzate in attività di customer support. In Atti del 32. Convegno nazionale ANIMP/OICE/UAMI. Milano : ANIMP. Dettagli
  106. Frattini, F., Nenni, M.E., Rossi, A., & Schiraldi, M.M. (2005). Master production schedule generation in a multi-item single-machine capacited manufacturing system with sequence dependent setup times and costs. In Proceedings of the 7th International Conference on the modern information technology in the innovation processes of the industrial enterprises (pp.197-202). Genova : ECIG. Dettagli
  107. Nenni, M.E., Schiraldi, M.M., & Van de Velde, S.L. (2005). Determining safety stock with backlogging and delivery spare time. In ICPR-18: conference proceedings: 18th International conference on production research: "The networked enterprise: a challenge for a sustainable development": Fisciano, 31 Luglio-4 Agosto 2005. Salerno : Università di Salerno. Dettagli
  108. Nenni, M.E., Rossi, A., & Schiraldi, M.M. (2004). Proposta di un criterio di valutazione del rischio di progetto ai fini della procedura di asseverazione delle iniziative di project financing. In Atti del 31. Convegno nazionale ANIMP/OICE/UAMI. Milano : ANIMP Servizi. Dettagli
  109. Lando, M., Nenni, M., & Schiraldi, M. (2003). Criterio di ottimizzazione della dotazione primaria ricambi nell’industria cantieristica. In Atti del XXX Convegno Nazionale ANIMP/OICE/UAMI. Milano : ANIMP Servizi. Dettagli
  110. Confessore, G., Nenni, M.E., & Schiraldi, M.M. (2003). La configurazione ottimale del magazzino. LOGISTICA MANAGEMENT, 95-100. Dettagli
  111. De falco, M., Nenni, M., & Schiraldi, M. (2003). Production strategies for exceptional orders management. In Proceedings of the 8th International Symposium on Logistics (pp.123-130). Centre for Concurrent Enterprise - University of Nottingham. Dettagli
  112. Lando, M., Nenni, M.E., & Schiraldi, M.M. (2003). Contributo metodologico alla preventivazione dell’impianto antincendio per edifici industriali. IMPIANTISTICA ITALIANA, XVI(6), 80-92. Dettagli
  113. Lando, M., Nenni, M., & Schiraldi, M. (2002). La gestione del livello di buffer per la programmazione operativa in processi a ciclo non definito. In Atti del XXIX Convegno Nazionale ANIMP/OICE/UAMI. Milano : ANIMP Servizi. Dettagli
  114. De Falco, M., Nenni, M., & Schiraldi, M. (2002). A complexity analysis model for management of Good Manufacturing Practice and ISO 9000-2001 compliancy simultaneous projects. Case study in the pharmaceutical industry. In Proceedings of the XVI IPMA World Congress on Project Management (pp.151-158). Berlin : IPMA. Dettagli
  115. De Falco, M., Nenni, M., & Schiraldi, M. (2002). Dynamic management model for offhire movements of a carrier fleet. In Proceedings of the 2002 NOFOMA International Conference. (pp.285-300). Trondheim : Norwegian University of Science and Technology. Dettagli
  116. Van de Velde, S., & Schiraldi, M. (2002). Substituting stock with time: the effect of delivery spare time on safety stock. In Proceedings of the 7th European Logistic Association Doctorate Workshop(ELA 2002). European Logistic Association. Dettagli
  117. De Falco, M., Nenni, M.E., & Schiraldi, M.M. (2002). Strategia di negoziazione dinamica della capacità produttiva. IMPIANTISTICA ITALIANA, XV(2), 57-63. Dettagli
  118. Macchiaroli, R., Nenni, M.E., & Schiraldi, M.M. (2001). Miglioramento di sicurezza e manutenibilità di macchine operatrici. Proposta di un modello per la verifica di conformità e performance. Paper presented at Convegno Scientifico Nazionale sulla Sicurezza dei Sistemi Complessi, Bari. Dettagli
  119. De Falco, M., Nenni, M., & Schiraldi, M. (2001). Sistema di supporto alla diagnosi per la manutenzione di apparati complessi. In Atti del XXVIII Convegno Nazionale ANIMP/OICE/UAMI. Milano : ANIMP Servizi. Dettagli
  120. De Falco, M., Nenni, M.E., & Schiraldi, M.M. (2001). Capacity allocation model with dynamic resources management. Paper presented at the IV SIMPOI / POMS 2001 Conference, Guaruja - Sao Paulo (Brazil). Dettagli
  121. De Falco, M., Nenni, M., & Schiraldi, M. (2001). Development of a product-costing model oriented to productive capacity analysis. In Proceedings of the IV SME-SME International Conference (pp.180-187). Aalborg : Department of Production - Aalborg University. Dettagli